Deployment
Production checklist
A deployment gate for secrets, networking, storage, identity, security controls, and operational readiness.
Use this checklist before exposing OpenVortexAI outside a trusted test network.
Secrets and identity
- Replace all example passwords and secrets.
- Store
JWT_SECRETandCREDENTIAL_ENCRYPTION_KEYin your secrets system. - Set a strong bootstrap administrator password and enable MFA.
- Disable local registration unless explicitly required.
- If using Entra ID, use the tenant GUID and an exact redirect URI.
- Test both primary and recovery authentication paths.
Network and proxy
- Terminate HTTPS at a trusted reverse proxy or edge.
- Set
FRONTEND_BASE_URL,API_BASE_URL, andNEXT_PUBLIC_API_BASE_URLto the external HTTPS origin. - Set
CORS_ORIGINSto exact trusted origins; do not use*with credentials. - Keep the API bound to loopback unless your topology requires otherwise.
- Configure WebSocket or streaming proxy behavior and generous response timeouts.
- Confirm CSP and HSTS behavior on the final public hostname.
Data and operations
- Place PostgreSQL, uploads, and Valkey data on persistent storage.
- Back up the database, upload path, Valkey data, and encryption key.
- Perform a restore test.
- Set resource limits and observe CPU during OCR and embedding work.
- Keep worker counts conservative until host utilization is known.
- Define log retention and review audit events.
Providers and data flow
- Add only approved model providers and endpoint URLs.
- Allow only approved models and assign roles/groups deliberately.
- Confirm which data can leave the network through model, search, Entra, and update endpoints.
- Configure DLP rules and test them with safe sample data.
- Decide whether the admin file library should be hidden with
ADMIN_BLOCK_FILE_VIEW=true.
Search and files
- If using web search, test the broker and each enabled provider.
- Review URL-fetch protections and broker egress policy.
- Test one text PDF and one scanned PDF.
- Verify text readiness and RAG readiness separately.
- Confirm the upload-size and allowed-extension policy.
Final smoke test
Run a chat, upload and delete a test file, query RAG, test search if enabled, review the audit entry, and restart the stack once. A deployment is not ready if it depends on an untested in-memory state.